Analysis of Methods for Extending the Life Cycle of a TP-100A Boiler
Reconditioning of the TP-100А boiler can be implemented via a number of engineering solutions, including a complete replacement of the heating surface of the primary and secondary steam superheating circuits, boiler drum replacement, pulverized coal system closing, installation of gas-tight water wa...
שמור ב:
| Principais autores: | , , |
|---|---|
| פורמט: | Artigo |
| שפה: | Inglês |
| יצא לאור: |
Lviv Polytechnic National University
2018-06-01
|
| סדרה: | Energy Engineering and Control Systems |
| נושאים: | |
| גישה מקוונת: | https://science.lpnu.ua/jeecs/all-volumes-and-issues/volume-4-number-1-2018/analysis-methods-extending-life-cycle-tp-100a |
| תגים: |
אין תגיות, היה/י הראשונ/ה לתייג את הרשומה!
|
