Analysis of Methods for Extending the Life Cycle of a TP-100A Boiler
Reconditioning of the TP-100А boiler can be implemented via a number of engineering solutions, including a complete replacement of the heating surface of the primary and secondary steam superheating circuits, boiler drum replacement, pulverized coal system closing, installation of gas-tight water wa...
I tiakina i:
| Ngā kaituhi matua: | , , |
|---|---|
| Hōputu: | Artigo |
| Reo: | Inglês |
| I whakaputaina: |
Lviv Polytechnic National University
2018-06-01
|
| Rangatū: | Energy Engineering and Control Systems |
| Ngā marau: | |
| Urunga tuihono: | https://science.lpnu.ua/jeecs/all-volumes-and-issues/volume-4-number-1-2018/analysis-methods-extending-life-cycle-tp-100a |
| Ngā Tūtohu: |
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
