PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure
Objective Affected by the occupation of existing buildings (structures) on the ground, the main retaining piles in shield receiving areas at both ends of some metro stations cannot be built. Therefore, it is necessary to study the pile-beam-arch (PBA)construction technology for expanding excavation...
Furkejuvvon:
| Váldodahkkit: | , , , , |
|---|---|
| Materiálatiipa: | Artigo |
| Giella: | Chinês |
| Almmustuhtton: |
Urban Mass Transit Magazine Press
2024-06-01
|
| Ráidu: | Chengshi guidao jiaotong yanjiu |
| Fáttát: | |
| Liŋkkat: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.06.026.html |
| Fáddágilkorat: |
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
