Cód QR

PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure

Objective Affected by the occupation of existing buildings (structures) on the ground, the main retaining piles in shield receiving areas at both ends of some metro stations cannot be built. Therefore, it is necessary to study the pile-beam-arch (PBA)construction technology for expanding excavation...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoirí: ZHENG Longchao, LI Ming, PAN Wu, LI Jing, LU Junfu
Formáid: Artigo
Teanga:Chinês
Foilsithe / Cruthaithe: Urban Mass Transit Magazine Press 2024-06-01
Sraith:Chengshi guidao jiaotong yanjiu
Ábhair:
Rochtain ar líne:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.06.026.html
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!