QR Code (код быстрого отклика)

Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China

Abstract The flood control ability of cascade reservoirs is affected by many factors, such as the inflow flood form, and flood control scheduling rules. When large cascade reservoirs were built, it is necessary to evaluate the overall flood control ability of the reservoirs and explore the best join...

Полное описание

Сохранить в:
Библиографические подробности
Главные авторы: Zhu Jing, Rongqi Zhang, Hexin Bao, Shanghong Zhang
Формат: Artigo
Язык:Inglês
Опубликовано: Wiley 2022-09-01
Серии:Journal of Flood Risk Management
Предметы:
Online-ссылка:https://doi.org/10.1111/jfr3.12802
Метки: Добавить метку
Нет меток, Требуется 1-ая метка записи!