QR код

Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China

Abstract The flood control ability of cascade reservoirs is affected by many factors, such as the inflow flood form, and flood control scheduling rules. When large cascade reservoirs were built, it is necessary to evaluate the overall flood control ability of the reservoirs and explore the best join...

Бүрэн тодорхойлолт

-д хадгалсан:
Номзүйн дэлгэрэнгүй
Үндсэн зохиолчид: Zhu Jing, Rongqi Zhang, Hexin Bao, Shanghong Zhang
Формат: Artigo
Хэл сонгох:Inglês
Хэвлэсэн: Wiley 2022-09-01
Цуврал:Journal of Flood Risk Management
Нөхцлүүд:
Онлайн хандалт:https://doi.org/10.1111/jfr3.12802
Шошгууд: Шошго нэмэх
Шошго байхгүй, Энэхүү баримтыг шошголох эхний хүн болох!