Systematic Rehabilitation Techniques and Dynamic Analysis of Bridge Deck System with Concrete-Filled Steel Tube Arches
Due to prolonged heavy traffic, the Wuhan Changfeng Bridge has experienced extensive cracking in its main girder structure. Of the bridge’s 60 crossbeams, 51 (85%) have developed cracks, while the deck pavement over the steel beams has accumulated a total of 648.8 m of transverse cracks. Additionall...
Salvato in:
| Autori principali: | , , |
|---|---|
| Natura: | Artigo |
| Lingua: | Inglês |
| Pubblicazione: |
MDPI AG
2024-12-01
|
| Serie: | Buildings |
| Soggetti: | |
| Accesso online: | https://www.mdpi.com/2075-5309/14/12/3891 |
| Tags: |
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
