Stress control method for concrete pouring construction of continuous CFST tied arch bridge: Calculation method and actual bridge case
When the concrete in the tubes of a continuous concrete-filled steel tube (CFST) tied-arch bridge is being grouted, if the grouting sequence is not reasonable, problems such as excessive tensile stress of the bridge piers and repeated tensioning of the tie rods will occur, which seriously affects th...
保存先:
| 主要な著者: | , , , , |
|---|---|
| フォーマット: | Artigo |
| 言語: | Inglês |
| 出版事項: |
Elsevier
2025-12-01
|
| シリーズ: | Case Studies in Construction Materials |
| 主題: | |
| オンライン・アクセス: | http://www.sciencedirect.com/science/article/pii/S2214509525008721 |
| タグ: |
タグなし, このレコードへの初めてのタグを付けませんか!
|
