Modeling construction cost overrun risks at the FEED stage for mining projects using PLS-SEM

The mining industry consistently faces significant cost overruns during construction, rooted in the Front-End Engineering Design (FEED) stage, with overruns reported between 25% and 37%, underscoring the need to investigate early-stage risk factors. This study utilizes Partial Least Squares Structur...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Principais autores: Maan Shafaay, Fahad K. Alqahtani, Abdullah Alsharef, Gongfan Chen
Format: Artigo
Jezik:Inglês
Izdano: Taylor & Francis Group 2026-05-01
Serija:Journal of Asian Architecture and Building Engineering
Teme:
Online dostop:http://dx.doi.org/10.1080/13467581.2025.2481242