QR kód

Evaluation of behaviors of earth and rockfill dams during construction and initial impounding using instrumentation data and numerical modeling

In this study, the behavior of Gavoshan dam was evaluated during construction and the first impounding. A two-dimensional (2D) numerical analysis was conducted based on a finite difference method on the largest cross-section of the dam using the results of instrument measurements and back analysis....

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: Mohammad Rashidi, S. Mohsen Haeri
Médium: Artigo
Jazyk:Inglês
Vydáno: Elsevier 2017-08-01
Edice:Journal of Rock Mechanics and Geotechnical Engineering
Témata:
On-line přístup:http://www.sciencedirect.com/science/article/pii/S1674775516300877
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!