Unsteady Seepage Analysis of Extra-high Core-wall Rockfill Dam During Impoundment
The water level of an extra-high core-wall rockfill dam rises rapidly during the impoundment period.To ensure the seepage stability of key parts such as the core wall,this study determines the calculation conditions according to the actual monitoring data.Based on the unstable saturated-unsaturated...
I tiakina i:
| Ngā kaituhi matua: | , , , , , |
|---|---|
| Hōputu: | Artigo |
| Reo: | Chinês |
| I whakaputaina: |
Editorial Office of Pearl River
2023-01-01
|
| Rangatū: | Renmin Zhujiang |
| Ngā marau: | |
| Urunga tuihono: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.06.009 |
| Ngā Tūtohu: |
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
