QR kód

Stability Analysis of Shield Cutter Replacement Ground Reinforced with Steel Pipe Pile-Grouting

Based on the Foshan-Dongguan Intercity Line Changlong Tunnel Project, indoor tests and numerical simulations were conducted to study the instability and progressive failure process of the cutter replacement ground at atmospheric pressure. The fast Lagrangian analysis of continua method was adopted t...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autor: DAI Zhiheng, ZHANG Mengxi, WEI Hui, GU Jie, ZHANG Xiaoqing
Médium: Artigo
Jazyk:Chinês
Vydáno: Editorial Office of Journal of Shanghai Jiao Tong University 2023-06-01
Edice:Shanghai Jiaotong Daxue xuebao
Témata:
On-line přístup:https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-6-690.shtml
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!