Stability Analysis of Shield Cutter Replacement Ground Reinforced with Steel Pipe Pile-Grouting
Based on the Foshan-Dongguan Intercity Line Changlong Tunnel Project, indoor tests and numerical simulations were conducted to study the instability and progressive failure process of the cutter replacement ground at atmospheric pressure. The fast Lagrangian analysis of continua method was adopted t...
Na minha lista:
| Autor principal: | |
|---|---|
| Formato: | Artigo |
| Idioma: | Chinês |
| Publicado em: |
Editorial Office of Journal of Shanghai Jiao Tong University
2023-06-01
|
| coleção: | Shanghai Jiaotong Daxue xuebao |
| Assuntos: | |
| Acesso em linha: | https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-6-690.shtml |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
