Large-Scale Production of Heliostats
Heliostats are the main cost factor of solar tower plants. To optimize them in terms of cost, it is mandatory to estimate the fabrication cost. A method to do so is presented and applied to a sample heliostat. The sample heliostat that is optimized for low production cost is of 2 m² size. The desig...
Zapisane w:
| Główni autorzy: | , , |
|---|---|
| Format: | Artigo |
| Język: | Inglês |
| Wydane: |
TIB Open Publishing
2025-11-01
|
| Seria: | SolarPACES Conference Proceedings |
| Hasła przedmiotowe: | |
| Dostęp online: | https://www.tib-op.org/ojs/index.php/solarpaces/article/view/2420 |
| Etykiety: |
Nie ma etykietki, Dołącz pierwszą etykiete!
|
