Large-Scale Production of Heliostats
Heliostats are the main cost factor of solar tower plants. To optimize them in terms of cost, it is mandatory to estimate the fabrication cost. A method to do so is presented and applied to a sample heliostat. The sample heliostat that is optimized for low production cost is of 2 m² size. The desig...
Na minha lista:
| Principais autores: | , , |
|---|---|
| Formato: | Artigo |
| Idioma: | Inglês |
| Publicado em: |
TIB Open Publishing
2025-11-01
|
| coleção: | SolarPACES Conference Proceedings |
| Assuntos: | |
| Acesso em linha: | https://www.tib-op.org/ojs/index.php/solarpaces/article/view/2420 |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
