QR Kod

5. Building CD

The 2009 and 2010 campaigns in Zone 4 had two major objectives. The first was to define the limits of Building CD. The second was the excavation of its rooms and spaces down to their latest level of occupation (mostly LM IIIB). Deeper tests were also conducted within certain rooms and around the bui...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Yazar: Letesson, Quentin
Materyal Türü: Chapter
Dil:Inglês
Baskı/Yayın Bilgisi: Presses universitaires de Louvain 2011
Online Erişim:https://hdl.handle.net/20.500.13089/54n3
https://books.openedition.org/pucl/3128
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!