5. Building CD
The 2009 and 2010 campaigns in Zone 4 had two major objectives. The first was to define the limits of Building CD. The second was the excavation of its rooms and spaces down to their latest level of occupation (mostly LM IIIB). Deeper tests were also conducted within certain rooms and around the bui...
Na minha lista:
| Autor principal: | |
|---|---|
| Formato: | Chapter |
| Idioma: | Inglês |
| Publicado em: |
Presses universitaires de Louvain
2011
|
| Acesso em linha: | https://hdl.handle.net/20.500.13089/54n3 https://books.openedition.org/pucl/3128 |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
