A carregar...
Optimizing Workover Rig Fleet Sizing and Scheduling Using Deterministic and Stochastic Programming Models
[Image: see text] We present deterministic and stochastic programming models for the workover rig problem, one of the most challenging problems in the oil industry. In the deterministic approach, an integer linear programming model is used to determine the rig fleet size and schedule needed to servi...
Na minha lista:
Publicado no: | Ind Eng Chem Res |
---|---|
Main Authors: | , , |
Formato: | Artigo |
Idioma: | Inglês |
Publicado em: |
American Chemical
Society
2018
|
Acesso em linha: | https://ncbi.nlm.nih.gov/pmc/articles/PMC6156096/ https://ncbi.nlm.nih.gov/pubmed/30270974 https://ncbi.nlm.nih.govhttp://dx.doi.org/10.1021/acs.iecr.7b04500 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|