A carregar...

Relative allocation on concurrent schedules can depend on schedule parameters when behavioral parameters are constant

We develop a simple model of switching between the initial links of a concurrent-chain procedure. Behavior is determined by four parameters μ(1), μ(2), q(1), and q(2). The first two are the basic rates of switching from Schedule 1 and Schedule 2, respectively. The second two are the probabilities of...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Main Authors: Houston, Alasdair I., McNamara, John M., Sumida, Brian H.
Formato: Artigo
Idioma:Inglês
Publicado em: 1987
Assuntos:
Acesso em linha:https://ncbi.nlm.nih.gov/pmc/articles/PMC1348302/
https://ncbi.nlm.nih.gov/pubmed/16812467
https://ncbi.nlm.nih.govhttp://dx.doi.org/10.1901/jeab.1987.47-127
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!