A carregar...
Investigation of Track Superstructure Ballastless Design
In 2009 there were constructed and brought into pilot operation two sections of RHEDA 2000 ballastless track designed by RailOne (Germany) with the participation of JSC ‘‘Roszheldorproekt”, one of them on the Moskovskaya Railway (in the VNIIZhT’s Testing Center at the station of Scherbinka) and anot...
Na minha lista:
Main Authors: | , , , , |
---|---|
Formato: | Artigo |
Idioma: | Russo |
Publicado em: |
Joint Stock Company «Railway Scientific and Research Institute»
2015-12-01
|
Colecção: | Вестник Научно-исследовательского института железнодорожного транспорта |
Assuntos: | |
Acesso em linha: | https://www.journal-vniizht.ru/jour/article/view/63 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|