A carregar...

Determination of Optimum Frame Rates for Observation of Construction Operations from Time-Lapse Movies

Construction professionals have been using time-lapse movies in monitoring construction operations. However, some amount of detail is always lost in the interval between two consecutive frames in a time-lapse movie. This poses the question: By how much can the frame rate be lowered from the standard...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Main Authors: Y. M. Ibrahim, A. D. Ibrahim, P. G. Chindo
Formato: Artigo
Idioma:Inglês
Publicado em: Engineering, Project, and Production Management (EPPM) 2012-07-01
Colecção:Journal of Engineering, Project, and Production Management
Assuntos:
Acesso em linha:http://www.ppml.url.tw/EPPM_Journal/volumns/02_02_July_2012/ID_021_2_2_57_65.pdf
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!