A carregar...

An Improved Discrete Artificial Bee Colony Algorithm for Flexible Flowshop Scheduling with Step Deteriorating Jobs and Sequence-Dependent Setup Times

This paper studies a flexible flowshop scheduling problem with step-deteriorating jobs and sequence-dependent setup times (FFSP-SDJ&SDST) where there are multiple unrelated parallel machines at each stage. The actual processing time of each job is modeled as a step function of its starting time....

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Main Authors: Hua Xuan, Huixian Zhang, Bing Li
Formato: Artigo
Idioma:Inglês
Publicado em: Hindawi Limited 2019-01-01
Colecção:Mathematical Problems in Engineering
Acesso em linha:http://dx.doi.org/10.1155/2019/8520503
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!