Engineering surveys for the rebuilding of culverts considering construction requirements
The main stage of the survey is a field survey as a result of which a decision is made on the need for reconstruction work. The object of the study is culverts on the section of the Ust-Ishim-Zagvazdino highway, which runs along the River Irtysh. During the inspection, defects in the culverts were i...
Gespeichert in:
| Hauptverfasser: | , , |
|---|---|
| Format: | Artigo |
| Sprache: | Inglês |
| Veröffentlicht: |
EDP Sciences
2023-01-01
|
| Schriftenreihe: | E3S Web of Conferences |
| Online-Zugang: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/80/e3sconf_etesd2023_01004.pdf |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|
