Simulation of Mosul Dam Reservoir Operation for Irrigation and Hydropower Generation
The current research aims to build a simulation model to study the effect of Jazeera irrigation projects (North, East and South) water requirements on hydroelectric power generation from Mosul dam hydropower plant. The simulation was applied from January 1988 to December 2006 on a monthly basis. A s...