Development and Performance Evaluation of a Degradable Temporary Plugging Agent for Wellbore Reconstruction
In wellbore reconstruction operations such as repairing damaged casings and remedial cementing, oil and/or gas zones need to be temporarily plugged off. To perform this job, a degradable compound core-shell structure gel temporary plugging agent was designed and developed with raw materials AM and P...
محفوظ في:
| المؤلفون الرئيسيون: | , , , , , |
|---|---|
| التنسيق: | Artigo |
| اللغة: | Chinês |
| منشور في: |
Editorial Office of Drilling Fluid and Completion Fluid
2026-01-01
|
| سلاسل: | Zuanjingye yu wanjingye |
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://www.zjyywjy.com.cn/article/doi/10.12358/j.issn.1001-5620.2026.01.017 |
| الوسوم: |
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
