Rib Alignment Control of Long-Span Arch Bridge in Cable-Stayed Buckle by Multi-Objective Optimization
The construction duration of long-span arch bridges is excessively prolonged due to insufficient closing precision and the non-convergence of traditional cable adjustment calculation methods. This study investigates cable force management in long-span concrete-filled steel tubular (CFST) arch bridge...
Guardat en:
| Autors principals: | , , , , |
|---|---|
| Format: | Artigo |
| Idioma: | Inglês |
| Publicat: |
MDPI AG
2024-10-01
|
| Col·lecció: | Buildings |
| Matèries: | |
| Accés en línia: | https://www.mdpi.com/2075-5309/14/10/3281 |
| Etiquetes: |
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
