Research on Influence of Shield Synchronous Grouting Parameters on Surface Deformation
In order to determine reasonable grouting parameters, control surface settlement, and reduce the risk of excessive surface settlement caused by irrational synchronous grouting parameters, this study studied the shield tunnel project between maglev T2 station and maglev T3 station. A numerical simula...
Enregistré dans:
| Auteurs principaux: | , , , , |
|---|---|
| Format: | Artigo |
| Langue: | Chinês |
| Publié: |
Editorial Office of Journal of China & Foreign Highway
2025-06-01
|
| Collection: | Zhongwai Gonglu |
| Sujets: | |
| Accès en ligne: | https://zwgl.csust.edu.cn/zwgl/article/html/202503023?st=article_issue |
| Tags: |
Pas de tags, Soyez le premier à ajouter un tag!
|
