Modeling and Analysis of a Cutting Robot for the “Excavation–Backfill–Retention” Integrated Mining and Excavation Equipment
To meet the mining requirements of the ’excavation–backfill–retention’ tunneling method for inter-panel coal pillars, this paper proposes an integrated ‘excavation–backfill–retention’ equipment system centered on a cutting robot. An interactive design method was employed to analyze the interaction b...
Na minha lista:
| Principais autores: | , , , , , , , , , , , |
|---|---|
| Formato: | Artigo |
| Idioma: | Inglês |
| Publicado em: |
MDPI AG
2025-04-01
|
| coleção: | Actuators |
| Assuntos: | |
| Acesso em linha: | https://www.mdpi.com/2076-0825/14/4/175 |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
