Código QR (código de barras bidimensional)

Settlement control of slurry shield tunnelling crossing adjacent buildings in mixed ground of round gravel and mudstone

The micro-disturbed construction in mixed ground is a major challenge in the shield tunnelling construction. The Nanning metro line 1 crossing You'ai buildings is confronted with the challenge of mixed ground of round gravel and mudstone. The sleeve-valve-pipe grouting technology is applied in the r...

Fuld beskrivelse

Na minha lista:
Bibliografiske detaljer
Hovedforfatter: XIE Xiong-yao 1, 2, WANG Qiang 1, 2, QI Yong 3, LI Jun 1, 2, YU Xing-guo 3
Format: Artigo
Sprog:Inglês
Udgivet: Editorial Office of Chinese Journal of Geotechnical Engineering 2017-09-01
Serier:Yantu gongcheng xuebao
Fag:
Online adgang:https://www.cgejournal.com/en/article/doi/10.11779/CJGE201709006
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!