क्यूआर कोड

Reliability-Based Performance Optimization of Tunnel Boring Machine Considering Geological Uncertainties

This paper is focused on developing an effective method to optimize the performance (e.g., advance rate and energy consumption) of a tunnel boring machine (TBM) by determining reasonable operating and structural parameters according to geological conditions. The TBM is a complex mechatronic system c...

पूर्ण विवरण

में बचाया:
ग्रंथसूची विवरण
मुख्य लेखकों: Lintao Wang, Wei Sun, Yangyang Long, Xu Yang
स्वरूप: Artigo
भाषा:Inglês
प्रकाशित: IEEE 2018-01-01
श्रृंखला:IEEE Access
विषय:
ऑनलाइन पहुंच:https://ieeexplore.ieee.org/document/8328809/
टैग: टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!