QR Code

Combined Kanban-POLCA Production Control in Two-Stage Sequential Hybrid MTS/MTO Production Systems: A Simulation-Based Evaluation

This paper analyzes the performance of a two-stage sequential hybrid MTS/MTO production system in which the order decoupling point is positioned between the manufacturing and assembly stages. In this configuration, the production control task separates into an upstream inventory control problem and...

Whakaahuatanga katoa

I tiakina i:
Ngā taipitopito rārangi puna kōrero
Ngā kaituhi matua: Nemanja Tulimirović, Ivan Tomašević, Matthias Thürer, Milena Gatić, Dragana Stojanović, Barbara Simeunović, Dragoslav Slović
Hōputu: Artigo
Reo:Inglês
I whakaputaina: MDPI AG 2026-02-01
Rangatū:Mathematics
Ngā marau:
Urunga tuihono:https://www.mdpi.com/2227-7390/14/4/673
Ngā Tūtohu: Tāpirihia he Tūtohu
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!