Optimization of Secondary Cooling Process for 150 mm×150 mm Billet Concasting
The 150 mm×150 mm billet of carbon and alloy constructional steel,high carbon steel and welding rod steel casts by R9 m 4 strand concaster at Shiheng Special Steel Works. Through optimized secondary cooling process modified 0.5~0.8 MPa water pressure,0.80~1.30 L/kg water ratio and 3 section manual...
Na minha lista:
| Autor principal: | |
|---|---|
| Formato: | Artigo |
| Idioma: | Chinês |
| Publicado em: |
Editorial Office of Special Steel
2005-04-01
|
| coleção: | Teshugang |
| Acesso em linha: | http://www.specialsteeljournal.com/thesisDetails?columnId=129768886&Fpath=home&index=0 |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
