QR Code

Transport of the 499.8 MHz SRF module for the BEPCII upgrade project

The Beijing Electron-Positron Collider II (BEPCII) was upgraded from 1.89 GeV to 2.35 GeV in 2025. Due to the increased electron beam energy, radio-frequency power and voltage requirements have more than doubled. To meet these demands, each ring utilizes two 499.8 MHz cavities. A new cavity module w...

Description complète

Enregistré dans:
Détails bibliographiques
Auteurs principaux: Hongjuan Zheng, Pei Zhang, Qiang Ma, Tianmu Xin, Facheng Zhao
Format: Artigo
Langue:Inglês
Publié: Elsevier 2026-08-01
Collection:Nuclear Engineering and Technology
Sujets:
Accès en ligne:http://www.sciencedirect.com/science/article/pii/S173857332600207X
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!