Transport of the 499.8 MHz SRF module for the BEPCII upgrade project
The Beijing Electron-Positron Collider II (BEPCII) was upgraded from 1.89 GeV to 2.35 GeV in 2025. Due to the increased electron beam energy, radio-frequency power and voltage requirements have more than doubled. To meet these demands, each ring utilizes two 499.8 MHz cavities. A new cavity module w...
Enregistré dans:
| Auteurs principaux: | , , , , |
|---|---|
| Format: | Artigo |
| Langue: | Inglês |
| Publié: |
Elsevier
2026-08-01
|
| Collection: | Nuclear Engineering and Technology |
| Sujets: | |
| Accès en ligne: | http://www.sciencedirect.com/science/article/pii/S173857332600207X |
| Tags: |
Pas de tags, Soyez le premier à ajouter un tag!
|
