kod QR

Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1

Since the trial operation of Changsha metro line 1, the train auxiliary converter has been overloaded many times,which has affected the normal operation of the train. The causes of the overload of the train auxiliary converter were analyzed,and the simulation test was carried out. The real causes of...

Szczegółowa specyfikacja

Zapisane w:
Opis bibliograficzny
Główni autorzy: Chao YANG, Yi YIN
Format: Artigo
Język:Chinês
Wydane: Editorial Department of Electric Drive for Locomotives 2019-07-01
Seria:机车电传动
Hasła przedmiotowe:
Dostęp online:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.04.030
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!