Cost analysis and estimation of integral synchronous jacking engineering of protective building
Based on the South Building renovation of a historical protective project in Shanghai, the difficulties and countermeasures of integral synchronous jacking are introduced in detail along with key technology and requirements of process monitoring. The engineering cost of sub-project is comprehensivel...
Sábháilte in:
| Príomhchruthaitheoir: | |
|---|---|
| Formáid: | Artigo |
| Teanga: | Inglês |
| Foilsithe / Cruthaithe: |
Editorial Department of Journal of Nantong University (Natural Science Edition)
2023-03-01
|
| Sraith: | Nantong Daxue xuebao. Ziran kexue ban |
| Ábhair: | |
| Rochtain ar líne: | https://ngzke.cbpt.cnki.net/portal/journal/portal/client/paper/26fa92c82228cd82c27d95c8955e436f |
| Clibeanna: |
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
