Cód QR

Configuration Synthesis and Kinematics Analysis of the 1R2T Parallel Mechanism in the Chinese Baijiu Box Packaging Production Line

A station in the Chinese Baijiu box packaging production line has a height difference between the two production lines due to the workshop layout, and the height difference will increase the defective rate of the Chinese Baijiu box base of the station. Aiming at the problem of high defective rate, a...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoirí: Liu Juan, Li Ruiqin, Wang Yuan, Ning Fengping
Formáid: Artigo
Teanga:Chinês
Foilsithe / Cruthaithe: Editorial Office of Journal of Mechanical Transmission 2023-06-01
Sraith:Jixie chuandong
Ábhair:
Rochtain ar líne:http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2023.06.007
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!