Application of Grouting Method for Underground Excavation Construction of Urban Rail Transit Connecting Passage in Water-rich Sandy Cobble Stratum
Objective Connecting Passage 1 in the interval of Jiujiang North Station and Longqiao Road Station of Chengdu Metro Line 19 Phase II is located in water-rich sandy cobble stratum. Limited by the location of the surrounding buildings (structures), it is not suitable to adopt conventional method for t...
Na minha lista:
| Principais autores: | , , , , |
|---|---|
| Formato: | Artigo |
| Idioma: | Chinês |
| Publicado em: |
Urban Mass Transit Magazine Press
2024-08-01
|
| coleção: | Chengshi guidao jiaotong yanjiu |
| Assuntos: | |
| Acesso em linha: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.08.059.html |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
