Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates
This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed int...