Settlement of piled raft foundation embedded in rock and its calculation method
Based on the settlement monitoring data of two piled rafts under a twin-tower building,the settlement characteristics of piled raft foundation is examined. It is shown that the piled raft settles as a whole underloading, while the settlement of piles under individual plate, which is located outside...
Gespeichert in:
| 1. Verfasser: | |
|---|---|
| Format: | Artigo |
| Sprache: | Inglês |
| Veröffentlicht: |
Editorial Office of Chinese Journal of Geotechnical Engineering
2019-07-01
|
| Schriftenreihe: | Yantu gongcheng xuebao |
| Schlagworte: | |
| Online-Zugang: | https://www.cgejournal.com/en/article/doi/10.11779/CJGE2019S2056 |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|
