DESIGN AND IMPLEMENTATION OF COMPUTER AIDED SYSTEM FOR QUALITY IMPROVEMENT INSPECTION AND TESTING FOR BOILER IN THERMAL ELECTRIC POWER STATION
There is a problem, in Iraq, due to the multitude of malfunction after the overall annual maintenance has been achieved, and that raises the cost of continuous repairs, one of the reasons of this problem, is the absence of planned testing and automation for testing devices, the second reason is the...
Zapisane w:
| Główni autorzy: | , , |
|---|---|
| Format: | Artigo |
| Język: | Inglês |
| Wydane: |
University of Baghdad
2007-06-01
|
| Seria: | Journal of Engineering |
| Hasła przedmiotowe: | |
| Dostęp online: | https://www.joe.uobaghdad.edu.iq/index.php/main/article/view/2453 |
| Etykiety: |
Nie ma etykietki, Dołącz pierwszą etykiete!
|
