Reliability Analysis of Flood Control Capacity of Tailing Pond
Taking the dry tailing pond of Mohan Guangming Mining Plant for example, reliability of flood control capacity of the tailing pond was analyzed in the paper. Through calculating peak discharge and flood volume and checking flood regulating, flood control capacity of the tailing pond was determined....
Gardado en:
| Principais autores: | , |
|---|---|
| Formato: | Artigo |
| Idioma: | Chinês |
| Publicado: |
Editorial Department of Industry and Mine Automation
2010-11-01
|
| Series: | Gong-kuang zidonghua |
| Assuntos: | |
| Acceso en liña: | http://www.gkzdh.cn/article/id/2056 |
| Tags: |
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
