An openBIM-Based Integrated Process for Quantity Take-Off and Schematic Cost Estimation to Support Schematic and Preliminary Design Decision Making
Construction projects are inherently complex systems that require effective decision-making during the schematic and preliminary design stages, when major design alternatives are evaluated and a substantial proportion of project costs is determined. Therefore, rapid and reliable cost estimation is c...
সংরক্ষণ করুন:
| প্রধান লেখক: | , |
|---|---|
| বিন্যাস: | Artigo |
| ভাষা: | Inglês |
| প্রকাশিত: |
MDPI AG
2026-06-01
|
| মালা: | Buildings |
| বিষয়গুলি: | |
| অনলাইন ব্যবহার করুন: | https://www.mdpi.com/2075-5309/16/12/2307 |
| ট্যাগগুলো: |
কোনো ট্যাগ নেই, প্রথমজন হিসাবে ট্যাগ করুন!
|
