Codice QR

Synchronous Assembly of Fully Prefabricated Central Partition Wall Top Joints in Large-diameter Metro Shield Tunnels

[Objective] To fully leverage the advantages of prefabricated structures and realize the synchronous construction of the top joints and main body of fully prefabricated CP (central partition) walls, a study is conducted on the synchronous assembly of the top joints of such walls. [Method] Based on t...

Descrizione completa

Salvato in:
Dettagli Bibliografici
Autori principali: DU Yanan, ZHU Yuanchang, GE Zhaoguo, TANG Zeren, QU Chunyu, LIU Xian
Natura: Artigo
Lingua:Chinês
Pubblicazione: Urban Mass Transit Magazine Press 2025-09-01
Serie:Chengshi guidao jiaotong yanjiu
Soggetti:
Accesso online:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20231320.html
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!