Synchronous Assembly of Fully Prefabricated Central Partition Wall Top Joints in Large-diameter Metro Shield Tunnels
[Objective] To fully leverage the advantages of prefabricated structures and realize the synchronous construction of the top joints and main body of fully prefabricated CP (central partition) walls, a study is conducted on the synchronous assembly of the top joints of such walls. [Method] Based on t...
Salvato in:
| Autori principali: | , , , , , |
|---|---|
| Natura: | Artigo |
| Lingua: | Chinês |
| Pubblicazione: |
Urban Mass Transit Magazine Press
2025-09-01
|
| Serie: | Chengshi guidao jiaotong yanjiu |
| Soggetti: | |
| Accesso online: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20231320.html |
| Tags: |
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
