QR kód

Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy

With the rapid development of China's economy,electricity demand has increased.As the largest clean energy in China,hydropower has been put into large-scale and centralized production,and the most complex large-scale hydropower system in the world is formed.However,short-term hydropower optimal sche...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: LI Chonghao, LI Shushan, TANG Hongbing, LIU Huan, MA Xiangyu, LIAO Shengli
Médium: Artigo
Jazyk:Chinês
Vydáno: Editorial Office of Pearl River 2023-01-01
Edice:Renmin Zhujiang
Témata:
On-line přístup:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.06.007
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!