A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). D...
Na minha lista:
| Principais autores: | , |
|---|---|
| Formato: | Artigo |
| Idioma: | Inglês |
| Publicado em: |
Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR)
2025-06-01
|
| coleção: | Brazilian Journal of Radiation Sciences |
| Assuntos: | |
| Acesso em linha: | https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636 |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
