Design and Construction of Sewage Structures Under High-Level Underground Water Conditions Using theTop-Down Method: A Case Study of Sewage Pumping Station PS2 in Dorood City
In this paper, various issues related to the design and construction of a pump station under high-level underground water conditions in Dorood City using different approaches are investigated. These methods include deep wells, sheet pile walls, and secant walls. By evaluating the deficiencies of the...
Na minha lista:
| Principais autores: | , , |
|---|---|
| Formato: | Artigo |
| Idioma: | Inglês |
| Publicado em: |
Water and Wastewater Consulting Engineers Research Development
2024-08-01
|
| coleção: | آب و فاضلاب |
| Assuntos: | |
| Acesso em linha: | https://www.wwjournal.ir/article_209265_a17b03af89ae63f906fa9ca4a226e8ed.pdf |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
