Key Parameters of Roof Cutting of Gob-Side Entry Retaining in a Deep Inclined Thick Coal Seam with Hard Roof
Gob-side entry retaining by roof cutting (GERRC) employed in a deep inclined thick coal seam (DITCS) can not only increase economic benefits and coal recovery, but also optimize surrounding rock structure. In accordance with the principles of GERRC, the technology of GERRC in DITCS is introduced and...
Gespeichert in:
| Hauptverfasser: | , , , , , |
|---|---|
| Format: | Artigo |
| Sprache: | Inglês |
| Veröffentlicht: |
MDPI AG
2019-03-01
|
| Schriftenreihe: | Energies |
| Schlagworte: | |
| Online-Zugang: | http://www.mdpi.com/1996-1073/12/5/934 |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|
