Pressure Drop Optimization of the Main Steam and Reheat Steam System of a 1000 MW Secondary Reheat Unit
The pressure drop of a main steam and reheat steam system should be optimized during the design and operation of a thermal power plant to minimize operation costs. In this study, the pressure drop of the main steam pipe and reheat steam pipe of a 1000 MW secondary reheat unit are optimized by modula...