Assessing dam spillway discharge capacity in response to extreme floods in Perak river hydroelectric scheme: Simulation and proposed mitigation measures
The aged dams in Perak river Hydro-Electric Scheme (HES) have been constructed decades ago and a common concern raised during dam safety reviews is that they were not designed to safely reroute the Probable Maximum Flood (PMF) but rather the Inflow Design Flood (IDF) of 1,000 years’ design floods. F...
I tiakina i:
| Ngā kaituhi matua: | , , , , , , , , |
|---|---|
| Hōputu: | Artigo |
| Reo: | Inglês |
| I whakaputaina: |
Elsevier
2023-11-01
|
| Rangatū: | Ain Shams Engineering Journal |
| Ngā marau: | |
| Urunga tuihono: | http://www.sciencedirect.com/science/article/pii/S209044792300429X |
| Ngā Tūtohu: |
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
