Impact of starting of tunnel boring machine during construction of connecting channel on existing shield tunnels
The impact of starting of tunnel boring machine (TBM) on the deformation of the existing shield tunnels under loads during the construction process of connecting passage by the shield tunneling method is currently unclear. By designing a 1:10 scaled model experiment, the experimental researches on t...
Uloženo v:
| Hlavní autor: | |
|---|---|
| Médium: | Artigo |
| Jazyk: | Inglês |
| Vydáno: |
Editorial Office of Chinese Journal of Geotechnical Engineering
2025-05-01
|
| Edice: | Yantu gongcheng xuebao |
| Témata: | |
| On-line přístup: | https://www.cgejournal.com/en/article/doi/10.11779/CJGE20231266 |
| Tagy: |
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
